PE Energy has again successfully supplied Wet Gas Flowmeter (Dual Stream 1) for the Forcado Yokri Integrated Project (FYIP). The project lasted 7 months, starting on 17th May 2018 and was completed on 21st December 2018. The project was delivered at FCA OEM factory for Shell Petroleum Development Company of Nigeria Limited (SPDC).
The project scope included 6” 900# raised face flanges, taper bored to suit 4” schedule 80 flowmeters, and metering panels (FCM-F01-DSFC-D1-01-P14-0+, Solartron).